Construction Method. All of our tunnels are built from the front, where the loading and unloading are located, to the rear. This approach allows us to complete the full insulated enclosure early in the process, including the floors, walls, ceiling, and internal lighting, while leaving the rear wall open for installation access. At the front, we begin with the access platform. This provides safe operator access to the system for loading, inspection, and maintenance. B - Infeed and Outfeed Con