The tubing from the Filtration Bag will be installed into valves 1 and 23.
During the process, cells are transferred from the chamber to this bag for filtration.
The bottom line of the Filtration Bag should be inserted into valve 1 and the top line into valve 23. Adjust the height of Bag Hanger A.